Construction Updates
Temporary Lane Closure: 191st Street at Rail Crossing
Last updated: August 24, 2015

Due to construction activity associated with maintenance of a Wolverine Pipeline Company pipeline that runs along the south side of 191st, the outside eastbound lane of this major transportation corridor through Mokena will be closed at the Rock Island District Line railroad crossing for approximately two weeks, from August 25 to September 8.

Thanks in advance for your patience and understanding during this temporary lane closure.


Front Street Metra Station Rehabilitation

Last Updated:  August 21, 2015

Work on the Front Street Metra station is expected to continue for approximately one more month.  Rehabilitation efforts include leveling a dip in the platform and replacing the tactile (caution) strip on the south side.  Work is ongoing to extend the south platform to the west.

For your safety, please do not walk through roped-off areas, and allow additional time to reach your boarding platform.

We apologize for any inconveniences as Metra makes these necessary station improvements.


Annual Road Maintenance Program

Last Updated:  August 21, 2015

Annual maintenance work began this past week on nearly 5.7 miles of your Mokena streets. Due to the volume involved, this work will take roughly 8-10 weeks to complete.

The program contains five steps (outlined below), and is set up like an assembly line.

  1. Sawcutting of the curbs and sidewalks on your street:  Make the cuts in the curbs and sidewalks where the old concrete will be removed and replaced.
  2. Removal and replacement of the curbs and sidewalks:  The old concrete is removed and new concrete is poured in its place.
  3. Grinding of asphalt:  2" of the old asphalt is taken off the top of the street through a grinding process.
  4. Pavement patching:  Any spots in the street that need extra attention are patched.
  5. A final new layer of asphalt is placed.

Once the first step is started and/or completed on your roadway, it could be a week or longer before the next step gets started.  While you may experience some inconvenience during construction, resurfaced streets are a positive outcome once completed, representing a great investment in your assets. 

Below is a list of the streets that are part of this year's program, as well as a map.  Check back weekly for updates on what work is being done in which areas.  Please contact us at (708) 479-3900 with any questions or concerns you may have about the program.  We appreciate the opportunity to serve you!

Project Streets
Pinegrove and Forestview subdivisions

  • Arbor Lane
  • Balsam Court
  • Burke Court
  • Everett Lane (from LaPorte to Forestview)
  • Forestview Court
  • Forestview Drive
  • Lakeview Way
  • Newton Way
  • Pinegrove Drive
  • Sorenson Court
Manchester Cove (Highland) subdivision
  • Crescent Drive
  • Heaton Court
  • Lowery Court
  • Puritan Drive
  • Thornham Lane
Country Pond Estates subdivision
  • Coach Drive
  • Country Pond Drive
  • Saddle Lane
  • Sage Brush Lane
Jenyglenn subdivision
  • 114th Avenue (from 187th to south end)
  • Eagle Trace Court
  • Jenyglenn Drive
  • Summer Gate Court
  • Swan Drive

Owens Road (from Lincoln Highway to EJ&E railroad tracks)
Scott Street
Boyer Court
Downtown alleys
Fintan Court
Bryant Road (from Wolf to Midland)

Map of Projected Road Work


Road Maintenance Weekly Update

Week of August 31 – September 4, 2015
~Placing new layer of asphalt on Owens Road
~Paving in Jenyglenn Subdivision
~Removing and pouring new concrete for curb & sidewalk replacements in Manchester Cove and miscellaneous areas
~Grinding of old 2 inch layer of asphalt surface in Manchester Cove
~Removing existing concrete curbs and sidewalks in Pinegrove & Forestview subdivisions
~Pouring new concrete for curb & sidewalk replacements in Pinegrove & Forestview subdivisions
~Grinding of old 2 inch layer of asphalt surface in Pinegrove & Forestview subdivisions

Week of August 24 - 28, 2015
~Pouring new concrete for curb & sidewalk replacements in Country Pond Estates
~Grinding of old 2 inch layer of asphalt surface in Country Pond Estates

~Placing new layer of asphalt in Country Pond Estates
~Removing existing concrete curbs and sidewalks in Jenyglenn Subdivision
~Pouring new concrete for curb & sidewalk replacements in Jenyglenn Subdivision
~Sawcutting of curbs in Manchester Cove and miscellaneous areas~Removing existing concrete curbs and sidewalks in Manchester Cove and miscellaneous areas
~Pouring new concrete for curb & sidewalk replacements in Manchester Cove and miscellaneous areas
~Sawcutting of curbs in the Pinegrove & Forestview subdivisions
~Grinding of old 2 inch layer of asphalt surface on Scott Street & Boyer Court
~Placing new layer of asphalt on Scott Street & Boyer Court

***For your safety and the protection of your vehicles, please adhere to the "NO PARKING" signage posted in areas where new asphalt is being laid. Please do not park on the street on paving days. Thank you.***

Wolf Road Water Main Replacement
Last Updated: August 28, 2015

Staging and set up will begin on Monday, August 31st for the water main replacement project on Wolf Road between 193rd and 194th Streets. There may be minor impacts to traffic.

Thanks in advance for your patience and understanding during this improvement project.